MEETING DATE:
MARCH 22, 2022
SUBJECT:
Title
RESOLUTION NO. 2022-8997 - APPROVING CONSTRUCTION DOCUMENTS AND AUTHORIZING THE CITY MANAGER TO AWARD, FINALIZE, AND EXECUTE CONSTRUCTION CONTRACT DOCUMENTS FOR THE ANNUAL SURFACE SEAL PROJECT FISCAL YEAR 2021 (CIP# ST001)
Body
Recommendation
Recommendation
ADOPT a resolution to approve the construction documents and authorize the City Manager to award, finalize, and execute the construction contract documents for the Annual Surface Seal Fiscal Year 2021 (CIP# ST001).
Body
Board or Commission Action
N/A
Relevant Council Strategic Theme
Quality of Life
Relevant Department Goal
N/A
Executive Summary
On an annual basis, the City uses a Pavement Management Program (PMP) to assign a value, known as a Pavement Condition Index (PCI), representing the current condition of each street segment. The PCI is utilized to prioritize maintenance and rehabilitation activities. It is important that preventative maintenance, such as a surface seal, be performed before pavement begins to rapidly deteriorate. Otherwise, more expensive rehabilitation or reconstruction will be required to bring the pavement to an acceptable condition. The Annual Surface Seal Fiscal Year 2021 Project (Project) involves a slurry seal and localized pavement repair for portions of Borden Road.
Discussion
The Project will surface seal portions of Borden Road between Woodland Parkway and Woodward Street. The work will include a slurry seal, pavement repair, temporary striping, permanent restriping, buffered bike lane striping, and the installation of new traffic detection loops at existing intersections along the corridor. The roadway segments shown on the plans were identified by utilizing PCIs from the City’s PMP.
Staff recommends that the City Council approve the construction documents, authorize advertisement for bids, and authorize and delegate the City Manager to award, finalize, and execute the construction contract documents for the Annual Surface Seal Fiscal Year 2021 (CIP# ST001).
Environmental Review
The Project is exempt from CEQA pursuant to Section 15301 Class 1 (c) of the CEQA guidelines as is it involves minor improvements and maintenance to an existing roadway without increasing the capacity of the facilities.
Fiscal Impact
The Project (CIP# ST001) is budgeted in the Fiscal Year 2021-2022 Capital Improvement Projects Budget.
Attachment(s)
Resolution 2022-8997
Attachment 1: Annual Surface Seal Fiscal Year 2021 (CIP# ST001) Improvement Plans
Prepared by: Michael Rafael, P.E., Senior Civil Engineer
Submitted by: Lewis Clapp P.E., Principal Civil Engineer
Reviewed by: Isaac Etchamendy P.E., Development Services Director/City Engineer
Approved by: Jack Griffin, City Manager